Risk, JHA, permits to work & change

Control of work from risk register to permit board, with nothing left to memory.

A company risk matrix, a risk register with bow-ties, job hazard analyses crews actually read, and permits to work with isolations, gas tests and sign-on. Management of change brings sign-offs and a pre-startup safety review into one record.

The live permit board showing active hot work and confined space permits

What it does

Inside Risk & permits

Your risk matrix

Any size from 3×3 to 6×6 with your own words and colors, used everywhere a risk is scored.

Risk register and bow-ties

Threats, preventive and mitigating barriers and consequences, drawn from the register and kept current.

Job hazard analysis

Steps, hazards and controls from a reusable step library, an editor that saves as you go, and crew briefings with sign-off.

Permits to work

Hot work, confined space and more, with precautions, lock-and-verify isolations, gas tests, fire watch, extensions and automatic expiry.

Clash detection and crew sign-on

Overlapping permits in one area are flagged. Crew sign on from 15 minutes before start, and only if their required training is current.

Management of change

Sign-off slots, risk before and after, and a pre-startup safety review that must pass before the change goes live.

A closer look

Bow-ties link threats, barriers and consequences to the risk they control.

A bow-tie diagram linking threats, barriers and consequences for a risk
  • 01One live picture of the work underway
  • 02Isolations verified by a second person
  • 03Changes reviewed before start-up, not after

Regulations and standards

The rules behind it

Summaries on this site are in our own words. Follow a link to read the official text. EHS Nation helps you keep records and run your program; it doesn't replace your own judgment or legal advice.

See EHS Nation with your own sites and forms.

Book a demo and we'll walk through the platform with your locations, your forms and your questions. No slides, no pressure.